Calculation of errors in adaptive time stepping

Hello everyone,

I am new to OGS5 and using it for simulating a geothermal doublet in my Master`s thesis. I want to use the time control method “PI_AUTO_STEP_SIZE”. Where can I find a more detailed explanation than in the keyword documentation on how the absolute and relative errors are calculated.
I would be glad about any help! Thank you

Jonas

You may have a look in this paper:

Modeling Soil-Coupled Water Uptake of Multiple Root Systems with Automatic Time Stepping

  • May 2011
  • Vadose Zone Journal 10(2):727-735
  • DOI: [10.2136/vzj2010.0099]