Possibility of separate processes for mesh sub-domains in a single simulation

Hello everybody,

Is it possible to have multiple processes which are done on different subdomains inside 1 project file/1 simulation?

E.g. if we want to simulate HT process for the reservoir and in parallel WELLBORE_SIMULATOR process for a 1D mesh of the wellbore inside the main domain?
Since for every timestep, WELLBORE_SIMULATOR inputs should depend on the reservoir simulation results (for that timestep).

Thank you and best regards

1 Like

Did you have a look at the HeatTransportBHE process in OGS? In our view this would be a simpler approach for you. Or is there a feature missing in this OGS process.

Yes, this is a known limitation of our Cosim interface at the moment. But lets start with the heat transport process including BHE in ogs first.