Possibility of separate processes for mesh sub-domains in a single simulation

Hello everybody,

Is it possible to have multiple processes which are done on different subdomains inside 1 project file/1 simulation?

E.g. if we want to simulate HT process for the reservoir and in parallel WELLBORE_SIMULATOR process for a 1D mesh of the wellbore inside the main domain?
Since for every timestep, WELLBORE_SIMULATOR inputs should depend on the reservoir simulation results (for that timestep).

Thank you and best regards